黑料网

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
June 08, 2026 06/07/2026 12:10 PM EDT CSV
June 04, 2026 06/03/2026 12:49 PM EDT CSV
June 05, 2026 06/04/2026 12:39 PM EDT CSV
June 06, 2026 06/05/2026 12:22 PM EDT CSV
June 07, 2026 06/06/2026 12:22 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 06/07/2026 02:45 PM EDT CSV
June 02, 2026 06/02/2026 11:35 AM EDT CSV
June 03, 2026 06/03/2026 11:55 PM EDT CSV
June 04, 2026 06/04/2026 09:20 PM EDT CSV
June 05, 2026 06/05/2026 11:35 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/07/2026 07:21 PM EDT CSV
June 03, 2026 06/03/2026 11:21 PM EDT CSV
June 04, 2026 06/04/2026 11:21 PM EDT CSV
June 05, 2026 06/05/2026 11:21 PM EDT CSV
June 06, 2026 06/06/2026 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/05/2026 02:03 PM EDT CSV
May 31, 2026 06/01/2026 04:33 PM EDT CSV
June 01, 2026 06/02/2026 02:53 PM EDT CSV
June 02, 2026 06/03/2026 12:34 PM EDT CSV
June 03, 2026 06/04/2026 02:02 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/05/2026 02:03 PM EDT CSV
May 31, 2026 06/01/2026 04:33 PM EDT CSV
June 01, 2026 06/02/2026 02:53 PM EDT CSV
June 02, 2026 06/03/2026 12:34 PM EDT CSV
June 03, 2026 06/04/2026 02:02 PM EDT CSV