黑料网

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
August 30, 2026 08/29/2026 12:15 PM EDT CSV
August 26, 2026 08/25/2026 12:35 PM EDT CSV
August 27, 2026 08/26/2026 12:17 PM EDT CSV
August 28, 2026 08/27/2026 12:05 PM EDT CSV
August 29, 2026 08/28/2026 12:49 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 08/29/2026 02:05 PM EDT CSV
August 25, 2026 08/25/2026 11:40 PM EDT CSV
August 26, 2026 08/26/2026 08:25 PM EDT CSV
August 27, 2026 08/27/2026 08:25 PM EDT CSV
August 28, 2026 08/28/2026 08:50 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 08/29/2026 03:51 PM EDT CSV
August 25, 2026 08/25/2026 11:18 PM EDT CSV
August 26, 2026 08/26/2026 11:21 PM EDT CSV
August 27, 2026 08/27/2026 11:21 PM EDT CSV
August 28, 2026 08/28/2026 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 08/28/2026 01:26 PM EDT CSV
August 23, 2026 08/24/2026 06:06 PM EDT CSV
August 24, 2026 08/25/2026 12:21 PM EDT CSV
August 25, 2026 08/26/2026 12:39 PM EDT CSV
August 26, 2026 08/27/2026 01:33 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 08/28/2026 01:26 PM EDT CSV
August 23, 2026 08/24/2026 06:06 PM EDT CSV
August 24, 2026 08/25/2026 12:21 PM EDT CSV
August 25, 2026 08/26/2026 12:39 PM EDT CSV
August 26, 2026 08/27/2026 01:33 PM EDT CSV