Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
May 29, 2026 05/28/2026 12:52 PM EDT CSV
May 25, 2026 05/24/2026 12:41 PM EDT CSV
May 26, 2026 05/25/2026 01:13 PM EDT CSV
May 27, 2026 05/26/2026 12:37 PM EDT CSV
May 28, 2026 05/27/2026 12:47 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 05/28/2026 05:55 PM EDT CSV
May 24, 2026 05/24/2026 10:20 PM EDT CSV
May 25, 2026 05/25/2026 10:30 PM EDT CSV
May 26, 2026 05/26/2026 11:40 PM EDT CSV
May 27, 2026 05/27/2026 11:30 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/28/2026 05:48 PM EDT CSV
May 24, 2026 05/24/2026 11:18 PM EDT CSV
May 25, 2026 05/25/2026 11:21 PM EDT CSV
May 26, 2026 05/26/2026 11:21 PM EDT CSV
May 27, 2026 05/27/2026 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/28/2026 12:52 PM EDT CSV
May 23, 2026 05/26/2026 11:29 AM EDT CSV
May 24, 2026 05/26/2026 12:55 PM EDT CSV
May 25, 2026 05/26/2026 02:03 PM EDT CSV
May 26, 2026 05/27/2026 12:36 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 05/28/2026 12:52 PM EDT CSV
May 23, 2026 05/26/2026 11:29 AM EDT CSV
May 24, 2026 05/26/2026 12:55 PM EDT CSV
May 25, 2026 05/26/2026 02:03 PM EDT CSV
May 26, 2026 05/27/2026 12:36 PM EDT CSV