Access the procedures that guide the relationship and coordination of operations between 黑料网’s master control center (MCC) and the separate local control centers (LCCs) in the region.
The ISO is responsible for operating all transmission facilities rated 115 kV and above. New England has seven LCCs, which are run by transmission owners and are responsible for operating transmission facilities rated 69 kV and above, with certain exceptions. LCC responsibilities include: