"C","ºÚÁÏÍø. Operational Capacity Update Report" "C","Filename: morning_report_20260724_20260724115024000.csv" "C","Report for 07/24/2026" "C","Report generated 07/24/2026 16:04:53 EDT" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","07/24/2026","11:50:24" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","07/23/2026","20","16637" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26707 "D","B. Capacity Additions EcoMax > CSO",1164 "D","C. Generation Outages and Reductions (Planned + Forced)",2641 "D","Generation Planned Outages and Reductions",485 "D","Generation Forced Outages and Reductions",2156 "D","D. Uncommitted Available Generation (Non-fast start)",6323 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",2634 "D","E. DRR Capacity",204 "D","F. Uncommitted Available DRR",14 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",-215 "D","NB",-86 "D","NECEC",-1090 "D","NYISO AC",-760 "D","NYISO CSC",225 "D","NYISO NNC",15 "D","Phase 2",0 "D","Net Deliveries",-1911 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",21008 "D","I. Peak Load Forecast For Hour Ending19",16750 "D","J. Total Operating Reserve Requirement",2047 "D","K. Capacity Required = I + J",18797 "D","L. Surplus = (+) Deficiency = (-) (H - K)",2211 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",2051 "D","Section 4. Largest First Contingency MW",1249 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",25228 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1436 "D","Ten Minute Reserve Estimate:",1436 "D","Thirty Minute Reserve Requirement:",611 "D","Thirty Minute Reserve Estimate:",2822 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-220,0,-215 "D","NB",-270,100,-86 "D","NECEC",-1250,0,-1090 "D","NYISO AC",-1400,1200,-760 "D","NYISO CSC",-346,330,225 "D","NYISO NNC",-200,200,15 "D","Phase 2",-2000,1200,0 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Clear","SE-13",74 "D","Hartford","Clear","S-6",79 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"