"C","ºÚÁÏÍø. Operational Capacity Update Report" "C","Filename: morning_report_20260117_20260117115736000.csv" "C","Report for 01/17/2026" "C","Report generated 01/17/2026 15:38:57 EST" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","01/17/2026","11:57:36" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","01/16/2026","18","17615" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",27360 "D","B. Capacity Additions EcoMax > CSO",1453 "D","C. Generation Outages and Reductions (Planned + Forced)",2086 "D","Generation Planned Outages and Reductions",386 "D","Generation Forced Outages and Reductions",1700 "D","D. Uncommitted Available Generation (Non-fast start)",8642 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",1763 "D","E. DRR Capacity",158 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",-225 "D","NB",-44 "D","NECEC",-1131 "D","NYISO AC",-1145 "D","NYISO CSC",105 "D","NYISO NNC",0 "D","Phase 2",-300 "D","Net Deliveries",-2740 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",20971 "D","I. Peak Load Forecast For Hour Ending18",16300 "D","J. Total Operating Reserve Requirement",2125 "D","K. Capacity Required = I + J",18425 "D","L. Surplus = (+) Deficiency = (-) (H - K)",2546 "D","M. Replacement Reserve Requirement",180 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",2366 "D","Section 4. Largest First Contingency MW",1251 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",20056 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1501 "D","Ten Minute Reserve Estimate:",1501 "D","Thirty Minute Reserve Requirement:",624 "D","Thirty Minute Reserve Estimate:",3170 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,0,-225 "D","NB",-1000,200,-44 "D","NECEC",-1250,0,-1131 "D","NYISO AC",-1600,1200,-1145 "D","NYISO CSC",-346,330,105 "D","NYISO NNC",0,0,0 "D","Phase 2",-2000,1200,-300 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Rain","SW-12",37 "D","Hartford","Snow","S-6",33 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"