"C","ºÚÁÏÍø. Operational Capacity Update Report" "C","Filename: morning_report_20251108_20251108115507000.csv" "C","Report for 11/08/2025" "C","Report generated 12/07/2025 17:31:18 EST" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","11/08/2025","11:55:07" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","11/07/2025","18","14619" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26450 "D","B. Capacity Additions EcoMax > CSO",1766 "D","C. Generation Outages and Reductions (Planned + Forced)",6644 "D","Generation Planned Outages and Reductions",4081 "D","Generation Forced Outages and Reductions",2563 "D","D. Uncommitted Available Generation (Non-fast start)",3462 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",1548 "D","E. DRR Capacity",166 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",398 "D","NECEC",0 "D","NYISO AC",-322 "D","NYISO CSC",0 "D","NYISO NNC",-35 "D","Phase 2",770 "D","Net Deliveries",811 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",17453 "D","I. Peak Load Forecast For Hour Ending18",13600 "D","J. Total Operating Reserve Requirement",2118 "D","K. Capacity Required = I + J",15718 "D","L. Surplus = (+) Deficiency = (-) (H - K)",1735 "D","M. Replacement Reserve Requirement",180 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",1555 "D","Section 4. Largest First Contingency MW",1248 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",17567 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1498 "D","Ten Minute Reserve Estimate:",1498 "D","Thirty Minute Reserve Requirement:",620 "D","Thirty Minute Reserve Estimate:",2355 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-210,0,0 "D","NB",-650,400,398 "D","NECEC",0,0,0 "D","NYISO AC",-900,400,-322 "D","NYISO CSC",0,0,0 "D","NYISO NNC",-60,60,-35 "D","Phase 2",-1400,1200,770 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Partly Cloudy","W-11",52 "D","Hartford","Clear","NW-8",49 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"