"C","ºÚÁÏÍø. Morning Report" "C","Filename: morning_report_20250718_20250718120207000.csv" "C","Report for 07/18/2025" "C","Report generated 08/11/2025 03:48:23 EDT" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","07/18/2025","00:00:00" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","07/17/2025","20","23413" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26074 "D","B. Capacity Additions EcoMax Bid > CSO",1321 "D","C. Generation Outages and Reductions (Planned + Forced)",1132 "D","Generation Planned Outages and Reductions",729 "D","Generation Forced Outages and Reductions",403 "D","D. Uncommitted Available Generation (Non-fast start)",3850 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",696 "D","E. DRR Capacity",221 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",-264 "D","NECEC",0 "D","NYISO AC",-730 "D","NYISO CSC",330 "D","NYISO NNC",-100 "D","Phase 2",-348 "D","Net Deliveries",-1112 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",23734 "D","I. Peak Load Forecast For Hour Ending19",19050 "D","J. Total Operating Reserve Requirement",2115 "D","K. Capacity Required = I + J",21165 "D","L. Surplus = (+) Deficiency = (-) (H - K)",2569 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",2409 "D","Section 4. Largest First Contingency MW",1249 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",24803 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1499 "D","Ten Minute Reserve Estimate:",1499 "D","Thirty Minute Reserve Requirement:",616 "D","Thirty Minute Reserve Estimate:",3185 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,150,0 "D","NB",-650,400,-264 "D","NECEC",0,0,0 "D","NYISO AC",-1400,1200,-730 "D","NYISO CSC",-346,330,330 "D","NYISO NNC",-125,125,-100 "D","Phase 2",-2000,1200,-348 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Clear","W-9",80 "D","Hartford","Clear","W-7",77 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"